Aibinu, A A, Ling, F Y Y and Ofori, G (2011) Structural equation modelling of organizational justice and cooperative behaviour in the construction project claims process: contractors' perspectives. Construction Management and Economics, 29(05), 463–81.

Gambatese, J A and Hallowell, M (2011) Factors that influence the development and diffusion of technical innovations in the construction industry. Construction Management and Economics, 29(05), 507–17.

Jarkas, A and Horner, M (2011) Revisiting the applicability of learning curve theory to formwork labour productivity. Construction Management and Economics, 29(05), 483–93.

  • Type: Journal Article
  • Keywords: formwork; labour inputs; labour productivity; learning curve theory; learning phenomenon
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/01446193.2011.562911
  • Abstract:
    The learning phenomenon has proved applicable in various industries, especially those associated with mass productions, such as aircraft and automobile assembly. The learning process in labour?intensive industries is assumed to be more significant in the sense that automated work is constrained by the fact that machines cannot benefit from previous experience and therefore would not ?learn? to run any faster or increase the rate of production. Several previous investigations into the applicability of learning curve theory to the construction industry proved the importance of this concept to labour productivity. Nevertheless, a thorough examination of the literature revealed a dearth of research into the effect of learning on the formwork operation of building floors. Consequently, the objective of this research is to explore the influence of recurring building floor configurations on formwork labour productivity. To achieve this objective, formwork labour inputs from 45 multi?storey in situ reinforced concrete building frames were collected and analysed using the straight?line learning curve model. The cumulative average input for each cycle, i.e. floor, and its associated cycle number were modelled using the least squares method. According to the learning curve theory, we expect the labour inputs to decrease by a certain percentage, as the cycle number increases. Based on the results obtained, there is very little evidence for that.

Kim, Y W, Han, S, Shin, S and Choi, K (2011) A case study of activity‐based costing in allocating rebar fabrication costs to projects. Construction Management and Economics, 29(05), 449–61.

Liou, F m, Yang, C h, Chen, B and Chen, W (2011) Identifying the Pareto‐front approximation for negotiations of BOT contracts with a multi‐objective genetic algorithm. Construction Management and Economics, 29(05), 535–48.

Pemsel, S and Widén, K (2011) Bridging boundaries between organizations in construction. Construction Management and Economics, 29(05), 495–506.

Shah, R K and Dawood, N (2011) An innovative approach for generation of a time location plan in road construction projects. Construction Management and Economics, 29(05), 435–48.

Thomas Ng, S, Fan, R Y C and Wong, J M W (2011) An econometric model for forecasting private construction investment in Hong Kong. Construction Management and Economics, 29(05), 519–34.